Thursday, November 28, 2019
The Scream
The Scream- analysis of painting Essay The drastic use of color has been used to depict the mood of the subject, with greens and intense reds contributing to a sense of chaos and disorder, which helps to reinforce the expression of the figure The lone emaciated figure stands on a bridge clutching his ears, his eyes and mouth open in a wide scream of fear, anguish and confusion. The green hue of the characters face and his grey clothing is symbolic of sickness and death in regards to his psychotic mental State. The red sky creates a sense Of alarm, and highlights the intensity Of the characters experience. Munch employs wavy brushstrokes to emphasis the situation that the character is feeling. Bold, curved strokes in the sky and river, make the viewer experience a sense of nausea. It gives the impression that the character is experiencing emotional agitation, and that his perception of the world may not be a true one. Contrast between the bright colors of the background and the dull, dark colors of the character create a sense of detachment. We will write a custom essay on The Scream- analysis of painting specifically for you for only $16.38 $13.9/page Order now We are able to see that although he is standing amidst a normal environment, he feels disconnected from reality. The figure is juxtaposed with the people on the bridge blurry and vague- giving a sense of segregation and isolation. The character feels alienated from those around him and from the real world. Munch uses a shallow pictorial space, and has utilized frontal figures, These poses produce the most convincing images of psychological conditions, adding to the paintings monumental and static quality. The composition, colors and dramatic use Of perspective, the undulating curves of the landscape and hollow figure personify alienation and anxiety. Munch described the event, Which took place on a trip to Gabardines in his diaries: l stood there trembling with fright and felt a loud, unending scream piercing nature. It reflects upon human emotions, and how our relationships With Others, and with our environment can affect us. The visual also deals with the human need to be acknowledged, and need for a sense Of belonging.
Monday, November 25, 2019
History of Women in ART essays
History of Women in ART essays History of Great Woman throughout Art Women have been active artists and endured their own period of renaissance. Since the beginning of humanity, women in art have been worshipped, venerated, treasured and admired. They also have been defamed, condemned, and abused in art. Although their have been many woman artists, their ability has not always been respected. Today there are many great women artists. It was only in the 20th century when the mass of women became eligible legally and culturally to receive the highest levels of artistic training and recognized as being great. The major reason for their lack of respect has to do with how women have been looked upon over the centuries. It was once thought that women are not capable of being bright or even particularly intellectual. The common thought throughout history has been that Women can't make great art and that creative genius could only be attained by men. Nonetheless, many women were indulged for their eccentricity and determination to make art during the early centuries. These women were daughter of famous artists or they worked in the church. Women were encouraged later to be well-rounded with a variety of skills which didn't necessarily mean visual arts, but also the skills necessary to make a home beautiful and entertain guests (Slatkin 121). These women were accepted as artists as long as it did not interfere with the running of the home, it was more of a hobby to them. Because women had the responsibilities of having babies and running the house, art was not their main focus. The subjects women painted were also affected by the period in which they lived. They often painted still life or feminine subjects such as objects and scenes from around the house. In the later centuries, as times were changing and the world was becoming more industrialized, women were out of the home more. Soon women did not feel like they had to conform to th...
Thursday, November 21, 2019
The Trends in Auto Industry Assignment Example | Topics and Well Written Essays - 3500 words
The Trends in Auto Industry - Assignment Example The total number of cars and commercial vehicles produced in Japan in 2006 was 11,484,233. The same number was 1,508,358 for Russia, 11,263,986 for USA, 5,819,614 for Germany,à 7,188,708 for China and 2,572,292 for Canada (ââ¬Å"OICA >> Production Statisticsâ⬠).The year 2008 will see a rise in the demand for eco-friendly cars especially in the USA which is the leading pollution causing the nation of the world. The infrastructure for supporting hydrogen car is being developed. Car companies like Toyota and Honda are aiming the hybrid markets. Honda has decided to lease more cars to individuals to get feedback for the future. In the year 1916 in Munich, Germany. In 1928 BMW acquired Eisenach vehicle factory and launched its first motorcar. The first car was an Austin Seven built under license(ââ¬Å"Welcome to BMW Company Factsâ⬠). BMW is also the worldââ¬â¢s largest manufacturer of luxury cars. The brands owned by BMW are BMW, MINI and Rolls-Royce. The BMW sales of un its in 2006 were 1,179,317 for BMW, 186,674 for MINI and 847 for Rolls-Royce. Its biggest buyers are European Union with 37% and the United States with a 22.8% share (ââ¬Å"Welcome to BMW Company Factsâ⬠).
Wednesday, November 20, 2019
Billing Programs Research Paper Example | Topics and Well Written Essays - 2750 words
Billing Programs - Research Paper Example The proposed visa would give foreign investors and their families a path to permanent residence in the U.S. if they invest at least $250,000. In the proposed StartUp Visa, investors would be given an initial two year visa and when its business had employed at least five workders after two years in business, the said investor would be given a green card. II. Concerns about the bill Indeed, the housing problem in the United States needs to be addressed. Unless the housing industry recovers, US economy cannot be considered as being out of economic crisis. At the onset, the bill looks novel and positive because it intends to solve the housing problem without any cost to the Federal Government. This however comes with a price of citizenship to foreigners whom we do not know and being such, might bring in unintended problems (Sarner). This necessitates a close scrutiny of the proposed bill if its intended benefits outweigh its projected issues. In addition, there is already a similar progr am in placed and one cannot help but ask, ââ¬Å"what is really new with this bill?â⬠Cost benefit analysis of the proposed bill under the lens of economics The first question that needs to be addressed is whether such bill will solve the housing problem in the US without first considering other factors such as security and social service. Scrutinizing it strictly under the lens of economics, the bill seems to be promising. The rest of the world especially China has performed relatively well compared to the United States (2% GDP compared to Chinaââ¬â¢s 9.7% in the first half of 2011) in terms of combating the economic crisis and being such, it has the economic capability to make such purchase. Economically, it seems to be a win-win... Indeed, the housing problem in the United States needs to be addressed. Unless the housing industry recovers, US economy cannot be considered as being out of economic crisis. At the onset, the bill looks novel and positive because it intends to solve the housing problem without any cost to the Federal Government. This however comes with a price of citizenship to foreigners whom we do not know and being such, might bring in unintended problems (Sarner). This necessitates a close scrutiny of the proposed bill if its intended benefits outweigh its projected issues. In addition, there is already a similar program in placed and one cannot help but ask, ââ¬Å"what is really new with this bill?â⬠Cost benefit analysis of the proposed bill under the lens of economics. The first question that needs to be addressed is whether such bill will solve the housing problem in the US without first considering other factors such as security and social service. Scrutinizing it strictly under the lens of economics, the bill seems to be promising. The rest of the world especially China has performed relatively well compared to the United States (2% GDP compared to Chinaââ¬â¢s 9.7% in the first half of 2011) in terms of combating the economic crisis and being such, it has the economic capability to make such purchase. Economically, it seems to be a win-win solution because it is beneficial to the foreigner who is going to buy the house for he or she also gains an extended stay. It is also beneficial to the US economy as it stimulates demands to the slumping housing industry.
Monday, November 18, 2019
Weeks 6 to 10 journal Essay Example | Topics and Well Written Essays - 1250 words
Weeks 6 to 10 journal - Essay Example From the appraisals, I learnt that, I was amongst the most efficient members of the organization. I managed to acquire a high percentage of scores. The management was confident of my skills and abilities, while the customers that we serve were impressed by my courtesy and zeal to serve their interests. I managed to learn that I am an efficient communicator, with the ability to solve problems in the most efficient manner. This was a boost to my morale, and the managers of the organization encouraged me to work hard, and improve further on my capabilities and skills. It is during this week that the management offered to train me on technological aspects of managing a court house, and the importance of innovation in the work place. This was an opportunity to advance my skills, and could earn me a promotion at the court house, despite being an intern. During this week, the lesson learnt is that working hard in our duties, would result to better performance. This in turn earns the respect of the management to an employee. During the seventh week of my internship, I was amongst the employees selected for training on information technology, and the importance of innovation in an organization. This selection was on merit, and it is because of the better results concerning my work during the appraisals. The trainings gave me an opportunity to learn new aspects of information technology and their importance in the administration of justice. For instance, I managed to learn that power point presentations in a court room help in explaining a point to the jury and the trial judge in a more effective way, than the use of oral presentation. Legal battles are always won on the manner in which an attorney presents the fact of the case in question. I also leant on the negative impacts of information technology in the administration of justice, and key amongst the impacts is the
Friday, November 15, 2019
Design And Build Procurement
Design And Build Procurement In this chapter, the definitions of Design and Build procurement including its concept and characteristics will be revealed. The success factors of using Design and Build procurement and the major task of developing the projects scope of work will be covered in great detail in this chapter. The definitive performance criteria of a project specifically in major aspects of time, cost and quality will deeply explained. The chapter then moves forward to the affect of features of Design and Build on roles and responsibilities of the contractor within the process. The explanation on ways of the contractor proposes to achieve them. This chapter then also describes the implementation of Design and Build in Malaysia accordingly to its history performance and problems that have been occurred in Malaysia by using Design and Build procurement. 2.1 INTRODUCTION OF DESIGN AND BUILD PROCUREMENT It is clear that there are many different variables to take into account when selecting the procurement method for our project. It is quite difficult due to each procurement methods differ from each other in unique ways. The key on making decisions on choosing the right procurement method is that each differs from the other on its own basis. Thus, it takes a few key questions to help decide which one should be use. The flow chart below shows the key questions and decisions on which procurement method should be used. The process of building procurement involves a series of different specialists in contributing to the construction work at different times. Design and build procurement has been in use for a very long time for more than a decade in the twentieth century. It has become more widespread across United State as well as around the world and had found in many industries. From a survey of trends in methods of procurement that were carried out by RICS from Davis Langdon and Everest revealed that in 1984, 5.06% of construction projects were procured on a Design and Build basis. Added that by 1991, this had risen to 14.78% .Revealing proudly by the Contract Journal July 1994, that the Design and Build turnover of the United Kingdoms top 70 Design and Build contractors increased by 15% during the period 1992 to 1993. The growth in the use of Design and Build recently as a procurement route is seen as being such radical change that could allow the industry to develop cost radical change that allo w the industry to develop cost models that automatically can reflect the construction rather than design processes. It seems as the most logical way to procure a building and thus given a clean slate to start with. However, many design professionals and owners had feared that this would result in the minimization or even destruction of the designers responsibility. This procurement is said to be able to furnish a design that maximizes quality within the projects budgetary constraints. Numerous successfully completed Design and Build projects range from housing, through industrial and commercial projects, to major complexes. It proves that this procurement method has very wide applicability. Frequently, the Design and Build contractor would be asked to contract with the clients designers, so that there is some continuity of the design effort, but the remaining design work is the contractors responsibility. This involves formally transferring the designers contracts from the client to the builder which is called novation. 2.1.1 DEFINITIONS OF DESIGN AND BUILD PROCUREMENT Design and build procurement is a procurement where it combine the design and construction process under a single entity. Design and Build terms are taken from its strategy itself where it would entail the contractor to carry out the work; the design work as well as the construction and also the completion of the work. As according to Turner (1990) and Jansen (1991) has supported that design and build contractor is supplying the procurement option of buying a finished building. While according to Masterman (1992) the term Design and Build has almost been unanimously interpreted and defined as being an arrangement where one contracting organization takes sole responsibility, normally on a lump sum fixed price basis, for the bespoke design and construction of a clients project. he then elaborate that this contains three elements; the responsibility for design and construction, contractors reimbursement is generally by means of a fixed price lump sum and the project is designed and built specifically to meet the clients need. Furthermore, as according to David Cappell (1997), Design and Build place responsibility for both design and erection in the hands of the contractor one point of responsibility for everything. However, theres an existence of one common thread that all Design Build delivery systems share which would be a single point of responsibilities for both design and construction. In other definition, Design and Build can be said as arrangement where one organization design and construct to the firm orders of the client for a single financial transaction. In general, the definition of Design and Build can be summarized as providing a single point responsibility for the whole design and construction. Below is a chart to differentiate between Design and Build procurement with traditional procurement. (a) (b) Figure 2.2: (a) Single point responsibility Design and Build Procurement (b) Fragmented responsibility Traditional Procurement (Source: Bennett and Grice, 1992) 2.1.2 CONCEPT AND CHARACTERISTICS OF DESIGN AND BUILD A basic concept in Design and Build procurement is that it requires the project to be contracted to a single organization which is responsible for design, procurement, and engineering and commissioning. The first step before choosing a procurement method should be through analysis of the projects characteristics on a global basis, including those technical requirements for design and construction. The projects owner will ensure that the entire context in which the project be delivered is thorough understood and can be accounted for in plans for schedule, price and quality. Once the owner has determined all the external constraints that might impact on its project, a project procurement method can be selected. There are quite many good reasons why an owner would select Design and Build for a given project. Theres a list of reasons for which an owner might decide that a project is suitable for the use of Design and Build procurement method. It would be: Where a compressed delivery schedule is required; A single point responsibility is required, Constructability consideration drive the design concept or details, Unique factors require special knowledge or experience to produce the least-cost design, The owner/designer must rely on the builder to optimize technology wit cost, The project will site-adapt a previous design, The project is a common commercial facility, The project is beyond the owners technical capability, Lastly, where risk can be shared to reduce cost. This can be supported by Masteman (2002), who argued that the definitions of the Design and Build contains three elements that would fundamental characteristics of this system, which are; the responsibility for design and construction lies with one organization, reimbursement is generally by means of a fixed price lump sum, and project is designed and built specifically to meet the needs of the client. 2.2 PERFORMANCE OF DESIGN AND BUILD An owner of a project would definitely want to obtain a building that satisfies his needs of good performance. The meaning of a good performance here require the project to form a high level of quality, of which including optimum economic price within the agreed time. Hashim (1996) concluded that the major factors tat affect the time and cost overruns would be; (1) the procurement systems adopted, (2) the variation works, (3) delay in subcontractors work, and lastly (4) shortage of building materials. She also provides her findings to prove the relation to the procurement systems used and their impact on time cost overruns. It is very crucial that the selection of the procurement method lies in the clients responsibility. Because of that, the selected procurement should; Meets the needs of the client, the type of project and the risks that might occur, can be handle by the client Related to the expertise available within the clients organization, resource and funding facility. Before the client decides which procurement method to be use, the relative importance of the three key criteria that need to be taken into account in procurement would be; time, cost and quality performance. TIME COST QUALITY The three criteria are inter-related. For instance, decisions affecting time will affect cost or both cost and performance. The key objective are exists to ensure that the clients objective are met effectively, efficiently and economically. 2.2.1 TIME Early completion of a project rather one of the most required by the client. Nevertheless, most construction project fails to achieve this requirement. Because of that the selection of procurement method to be use should be done wisely. This requirement of early completion can be achieved if construction starts before the design is completed. It can be said that the greater overlap between the construction and the design stage, the less time will be required to complete the project. However, the amount of variation is likely to increase because of this relation. Form the studies by University of Reading (United Kingdom) evaluate that the construction speed of design and build projects is 12% faster than traditional approaches and the overall project delivery speed (including design and construction) is 30% faster than traditional methods. Added that, the certainty of completion in time increases with the earlier the contractors involve in the design processes. 2.2.2 COST Lower cost of the construction project is another factor that is most important in ones employer requirement. The overlap between the design and construction means that construction starts before the cost is fixed, which will increase the uncertainty over the cost. This will drag the cost forecasting to become critical. Research had found out that time or cost have a real strong interactions between the design and build system. Also, from findings it stated that by combining the full overtime schedule, average ordering and also fast track construction with moderate crashing of design can made achieve towards improvements in both time and cost. By the researchers findings, it had stated that 75% of design and build project were completed within 5% of budget, compared with 63% of traditional projects. Design and build projects are at least 13% cheaper than traditionally procured projects. Greatest cost certainty is achieved for design and builds projects when the owners requirements are detailed. 2.2.3 QUALITY The issue of building quality is very important. From the facts, the quality performance characteristics determine the project time and cost. The performance of a project includes the function of the facility, its quality and appearance and durability, together with reliability and efficiency of the operation. The quality performance required from the completed facility is where it has the ability to control and make changes to the detailed specification after the contracts have been let. Design and build consistently better in meeting quality requirements for complex or innovative buildings rather than simple, standard, traditional buildings. 2.2.4 ROLES AND RESPONSIBILITIES OF THE CONTRACTOR The roles and responsibilities of each of the members of the project team should be considered carefully to avoid problems associated with assembling temporary teams of professionals. The contractors are responsible to; (1) undertake the design work outlined in contractors proposal which match with the employers requirements, (2) to fabricate the building, (3) to coordinate and integrate the entire process. The figure below shows the relationship of project team in design and build procurement. This contractual relationship in design and build is clearly shows that the contractor is responsible for everything. The design and build process increases the opportunities to use the contractors experience during the design stages of the project and their key strengths in management of the construction works. The extension of the contractors role design role is sometimes much less than the associated design responsibilities. The contractor then takes the responsibility for the design, without having any previous involvement with the design team. However, with the variability of types of construction projects and the experiences of clients in such projects, recent research had found that contractors may lack proper understanding of managing the varying types of design processes. The contractor must do whatever it takes to achieve the employers requirements. A single point responsibility means that the contractor is responsible for ensuring that the project is completed in time within the specified budget. Any delays beyond the control of the employer would be at the risk of the contractor. Other than that, the contractor also has to take into account the qualities that are agreed between the employers. Design and build contractors should understand the aesthetics or architecture value because the clients might not understand this kind of things. However, to ensure a contractor to produce what is specified by the client is not the same as ensuring the contractor producing a good and high quality building. 2.3 IMPLEMENTATION OF DESIGN AND BUILD PROCUREMENT IN MALAYSIA Construction activities occurred mostly on the more developed western side of peninsular Malaysia, which would be around KL. It began to gain importance in the economy in the 1990s through its roles in the areas of reconstruction and modernization. There are seven main elements of the processes of construction procurement considered to be specific to Malaysia. These seven elements are divided into two broad categories; (1) the processes during preconstruction stage, and (2) the processes during construction stage. The processes of construction procurement during preconstruction stage are: Initiation / promotion Funding Design schematic design, detailed design and specialist design. Statutory approval approval to initiate and to construct a facility and final approval to occupy the completed facility. Tendering The processes of construction procurement during construction stage are: Construction management and physical construction processes. Risk allocation The mostly used procurement are listed below in order of their importance that has been identified as the dominant procurement systems in Malaysia. Traditional lump sum system Design and build / turnkey system Management contracting 2.3.1 HISTORY AND BACKGROUND OF STUDY Design and build procurement was first launched in the Public Works Department by the Malaysian Prime Minister in 1983. The first unit that has applied the system would be by the Kuala Terengganu Hospital, which was completed in 1985. Research has shown that there is a continuous increase in the use of Design and Build over the last 24 years. The system use in Malaysia was pioneered by the JKR. In this system, there exist only two parties, i.e., the client and the contractor. In Malaysia, comprehensive data on the use of different types of procurement systems is not available. However, design and build is one of the procurement systems frequently used in Malaysia. 2.3.2 CONTRACTORS IN MALAYSIA The total goals of a project to significant cost savings, time savings and better quality can be achieve in considering the contractors construction experience in earlier construction phases. Since the system of design and build become successfully growing in recent years, many contractors are successfully operate in this market and they bring appropriate skills to bare in regard to the management and co-ordination of the overall process. However, the studies from Nima, M.A. M.R. Abdul-Kadir et al. (2001) also Rosli M.Z. (2004) show a shortage of knowledge among Malaysian contractors. They added that, a contractor have a supreme position in developing the constructability issue in different stages of construction projects which decreases probability of stoppages, delays and contract modifications. Any contribution from construction players in early stages of project can supply a useful guidance to bring deconstruction rules to design phase (Herman et al., 2003). The issue in this country is where the construction contractors are not invited to participate in design activities, before the design reaches to end. This will reduce their ability to influence the project specification finally. Other researches had state that different sources of knowledge has emphasized on importance of design phase and decisions that can make tremendous changes in the project output (BCA, 2005; Construction Industry Review Committee, 2001; Galvinich, 1995; Gray Hughes, 2001; Nima et al., 2002; Unlik Lones, 1998). The more integration will result in greater amount of cost savings, labor savings and also less substance wastage. The design itself can lead the contractors to choose a better construction method which helps to an improved constructability. In addition, the contractors can use their construction experience to help the designers in better designs, then they can try to increase the flexibility of the project to avoid any later design modifications that requires more money injections to the projects (Lam et al., 2007). 2.3.3 ADVANTAGES AND DISADVANTAGES IN DESIGN AND BUILD Ndekugri Turner (1994) suggests that by using design and build can provide better value for money and can give rise to fewer disputes than other procurement methods. One of the key advantage by using design and build is the opportunity to integrate the design and construction components. Argues by Saxon (2000) include that design and construction offers better performance in time and costs and results in lesser defects. The main advantages of design and build system that are obviously shown include: Single point responsibility for both design and construction processes Price is fixed in advance of construction Overlapping of design and construction process (in contrast to the traditional system) The design and build contractor could incorporate the concept of buildability into the design which in turn would facilitate speedier and economical construction production. However, implementing design and build procurement also have the cons that need to be aware of. Its disadvantages are: Unclear client brief (Ho et al., 1996; Chan, 1997; Ernzan Schexnayder,2000) Lack of standard forms of contract (Ho et al., 1996; Gunning McDermott, 1997) Inadequate and insufficient information and coordination among parties (Ndekugri Church, 1996; Ho et al., 1996) Late design changes (Gunning McDermott, 1997; Chan, 1997). The projects costs could be higher than the traditional system Projects often lacks of aesthetic values The system is not very accommodative to changes Other than that, Smith (1992) stated some of his research of design and build difficulties that may have to be faced: Contractor dominated by staff who are unfamiliar with the design process Inadequate fee quoted for design services by consultants Contractors operational staff too busy to consider design issues Contractors lacks expertise to manage the design interface between consultants and subcontract designers Contractor leaves subcontractors to co-ordinate work amongst themselves 2.4 CONCLUSION Alternative project system or delivery is gaining popularity towards Malaysia and outside countries. From this literature, we can see that the implementation of design and build in Malaysia proven to be one of the successfully delivering method in an expeditious manner without sacrificing quality or economy. As for the contractors in Malaysia, the lack of knowledge can become the main reason to the unsuccessful of design and build delivery. Other than that, design and build seems the most appropriate delivery method that can improve ones project performance. DRAFT OF CHAPTERS CHAPTER 1 ABSTRACT CHAPTER 2 LITERATURE REVIEW CHAPTER 3 RESEARCH METHODOLOGY CHAPTER 4 DATA ANALYSIS (CONTRACTORS VIEW ON DB) CHAPTER 5 DATA ANALYSIS (DB ACHIEVEMENT) CHAPTER 6 CONCLUSION TABLE OF CONTENT CHAPTER 2 LITERATURE REVIEW 2.0 INTRODUCTION 2.1 INTRODUCTION OF DESIGN AND BUILD PROCUREMENT 2.1.1 Definitions of Design and Build Procurement 2.1.2 Concept and Characteristics of Design and Build Procurement 2.2 PERFORMANCE OF DESIGN AND BUILD 2.2.1 Time 2.2.2 Cost 2.2.3 Quality 2.2.4 Roles and Responsibilities of the Contractor 2.3 IMPLEMENTATION OF DESIGN AND BUILD PROCUREMENT IN MALAYSIA 2.3.1 History and Background of Study 2.3.2 Contractors in Malaysia 2.3.3 Advantages and Disadvantages of Design and Build 2.4 CONCLUSION
Wednesday, November 13, 2019
Grapes of Wrath Essay: Steinbecks Use of Universal Archetypes
Use of Universal Archetypes in The Grapes of Wrath John Steinbeck sets his novel The Grapes of Wrath during the Depression of the 1930's. Universal archetypes play a significant role in Steinbeckââ¬â¢s story. Steinbeck creates a cast of characters whose archetypes can be easily related to. The Earthmother, haven versus hell, and the evil figure with the ultimately good heart are archetypes described in The Grapes of Wrath to show the bad and good times during a time of hardships. During a period of arduous and zestful moments, the archetypal Earthmother can be identified in the Joad household. Ma Joad is the citadel in the family. She thinks and cares not for herself but for the family and people. Ma has helped keep the family stable, " She seemed to know that if she swayed the family shook" (96). Even in times when food was scarce, Ma spared what she could to help those without. Ma said, "´ Look, you little fellas go an' get you each a flat stick an' I'll put what's lef' for you '" (331). The Earthmother is characterized by the willingness and thoughtfulness in helping and nurturing the family and fellow neighbors. Ma's daughter, Rose of Sharon, gradually changes to an Earthmother. Rose of Sharon finds herself being concerned with the welfare of her baby. She is in constant worry about whether she is giving enough nutrients from milk and food to bring a healthy baby in the world. Rose of Sharon's final act of nurturing shows how she accepts her rol e as Earthmother. " She looked up and across the barn and her lips came together and smiled mysteriously" (589). With this smile, the mystery of motherhood is understood by Rose of Sharon. Though she was unable to g... ...a sanctuary and a place of peace and beauty while the hells are gruesome and of cruelty. In the Grapes of Wrath, Steinbeck incorporates the Earthmother, the evil figure with the ultimately good heart, and the haven versus hell as archetypes to describes the characters and the situations in the novel that the migrants experiences on their excursion through the enjoyable and mendacious times. Ma and Rose of Sharon for there nurturing and caring of others characterized the Earthmother. Not only the Joads, but also other migrants encountered the evil figure with the ultimately good heart. The Haven and the hell are both symbolic of the dwellings the migrants and the Joads went through. These are archetypes that are described in John Steinbeck's The Grapes of Wrath in order to create a story of real life experiences during the depression of the 1930's.
Subscribe to:
Posts (Atom)